Title: RISK MANAGEMENT AND COSTS OPTIMIZATION IN DRILLING OF OIL WELLS BASED ON THE APPLICATION OF SMART FIELD TOOLS

RISK MANAGEMENT AND COSTS OPTIMIZATION IN DRILLING OF OIL WELLS BASED ON THE APPLICATION OF SMART FIELD TOOLS
E. Katysheva
1314-2704
English
21
7.2
• Prof. DSc. Oleksandr Trofymchuk, UKRAINE
• Prof. Dr. hab. oec. Baiba Rivza, LATVIA
The depletion of oil fields in traditional production regions leads to the need to involve hard-to-recover reserves in the development. This, in turn, is associated with a significant increase in the cost of production. Well construction costs are subdivided into costs that depend on the time of drilling and costs that depend on the amount drilled. The article indicates that one of the main methods of reducing the cost of drilling is to increase the efficiency of productive time and reduce non-productive time in the structure of the time balance. The process of drilling wells is inextricably linked with the occurrence of various complications and accidents, which, in turn, is the cause of unproductive time and entails an increase in the cost of drilling a wellbore. The reasons leading to complications and accidents during drilling are often unaccounted for risks at the design stage. Complications and accidents during drilling should be considered as an object of risk management. The article notes that the implementation of the concept of an intelligent field is a necessary tool for optimizing production and managing risks arising during the drilling process and leading to complications. When implementing well drilling projects, pre-drilling modeling and risk analysis are highly important as one of the components of a smart field system, since they can minimize costs and reduce non-productive time. It is indicated that computer modeling and risk management and control systems, as elements of the concept of an intelligent field, are the most effective tools for solving problems of reducing the time spent on drilling wells. Such pre-drilling modeling can be performed by building 3D digital geological models. The principle of operation of the PERFORM system is given, the purpose of which, as a risk management system during drilling, is to prevent complications or reduce their impact. It was concluded that the achievement of maximum and effective results with active risk management is possible in synergy with modern technologies in the field of computer modeling, through which a geological model of the reservoir is built, then the best drilling plan is determined, and the entire cycle of work is carried out using risk control and management systems. These risk control and management systems make it possible to determine the causes of predicted complications at an early stage, which makes it possible to refine and correct the drilling plan and the built geological model, avoiding the occurrence of accidents.
conference
21st International Multidisciplinary Scientific GeoConference SGEM 2021
21st International Multidisciplinary Scientific GeoConference SGEM 2021, 16 - 22 August, 2021
Proceedings Paper
STEF92 Technology
SGEM International Multidisciplinary Scientific GeoConference
SWS Scholarly Society; Acad Sci Czech Republ; Latvian Acad Sci; Polish Acad Sci; Serbian Acad Sci & Arts; Natl Acad Sci Ukraine; Natl Acad Sci Armenia; Sci Council Japan; European Acad Sci, Arts & Letters; Acad Fine Arts Zagreb Croatia; Croatian Acad Sci
855-862
16 - 22 August, 2021
website
cdrom
8204
production costs; well drilling; complications; intellectual field; computer modeling; risk management and control

25th SGEM International Conference on Earth & Planetary Sciences


International GeoConference SGEM2025
27 June - 6 July, 2025 / Albena, Bulgaria

Read More
   

SGEM Vienna GREEN "Green Science for Green Life"


Extended Scientific Sessions SGEM Vienna GREEN
3 -6 December, 2025 / Vienna, Austria

Read More
   

A scientific platform for Art-Inspired Scientists!


The Magical World Where Science meets Art
Vienna, Austria

Read More