
GEOTECHNICAL DESIGN OF THE FOUNDATION OF A STATICALLY DIFFICULT BRIDGE STRUCTURE SITUATED IN COMPLICATED ENGINEERING GEOLOGICAL CONDITIONS ABOVE THE HRICOV RESERVOIR
(STEF92 Technology, 2021-12-20, Ľuboš Hruštinec)
Show more
The article deals with the geotechnical design and assessment of the foundation of a statically difficult bridge structure founded in complicated engineering geological conditions. Bridge structure No. 223 is part of the D3 motorway situated above the Hricov reservoir near the town of Zilina (Slovakia). The realized engineering geological survey showed that the geological composition of the subsoil is nonhomogeneous and complicated (occurrence of Quaternary soils and Mesozoic rocks). The physical and mechanical pr...




